This is a point-in-time record of the week of 2026-01-26 to 2026-02-01. It was written from the repository's history for that week and is not revised afterwards, so later pages may supersede what it says.
Week of 2026-01-26 to 2026-02-01
Window: 2026-01-26 00:00:00 to 2026-02-01 23:59:59, local author time Recapped: 2026-08-30 Commits in window: 17 (17 non-merge, 0 merges)
This is a backfill written 210 days after the window closed. It is the
first week in this repository, but not the beginning of the CarTracker idea.
The public predecessor, whitewalls86/Car-Tracker,
contains 44 commits from May 15 to June 9, 2025. Its final form was a local
Python application with a committed SQLite database, a Streamlit dashboard,
price history, listing verification, user-agent rotation and a batched job
dispatcher.
The January 28 import is a clean rewrite rather than a git continuation. A
blob comparison found no shared application-code files between the old
repository's final tree and 78d8f86; only empty/package and IDE metadata
files match exactly. The rewrite keeps the same domain—Cars.com listings,
VINs, prices and active/unlisted state—but changes the operating model to
Docker, FastAPI, n8n, Postgres, retained raw HTML artifacts and observation
tables.
What shipped
78d8f86 established the new system in one large import: the scraper API,
results/detail processors, five n8n workflows and the Postgres schema. Raw
pages became first-class artifacts, and listing state became a set of SRP and
detail observations rather than updates to one local SQLite row.
The rest of January made that foundation runnable and analytical. 3533abd
and 4a2cbb2 added and corrected Docker Compose; 516ec7e added a support
bundle; c5bde3f, 8779043, 0e54172, 23cf7c3, de7280c and 4b39d43
built the dbt backbone from staging through VIN mapping, price events,
vehicle snapshots and operational staleness models. f81dea0 separated the
scraper package, while 88ef13f added dbt_runner and rewired n8n to invoke
dbt. fc7889b repaired refresh logic, and cf00ca2 added the first README and
dependency hygiene.
No numbered plans existed yet. The work is therefore described from the commit bodies and file changes, not retroactively assigned to plans created in March.
What moved between states
Nothing moved. docs/PLANS.md did not exist during this window, and the
planning-history parser reports zero index revisions.
What is still owed
The week ended with a runnable but young rewrite and no planning index. Git records no further work in this repository until March 12, so it cannot say whether the intervening gap was intentional, blocked or simply unrecorded. As of 2026-08-30, later recaps and the completed-plan ledger cover the system's subsequent planning history; no planning-state action is inferred from this pre-plan week.
Unattributed commits
All 17 non-merge commits are unattributed because none names a plan in its subject or body:
78d8f86 asdf
9218b5e asdf
0f325c1 adding gitignore
3533abd Add docker-compose and ignore local env secrets
4a2cbb2 Fix docker-compose to use external volumes and compose-managed build
516ec7e Add debug bundler.
c5bde3f adding dbt backbone
76eba39 Remove ide files
8779043 standing up DBT environment, building first tables.
0e54172 dbt improvements
23cf7c3 details model
de7280c adding more dbt models, tests, and updating workflow logic to pass listing id correctly into detail table
4b39d43 adding more models to approach dbt dropping into workflow
f81dea0 refactor for new dbt_runner tooling
88ef13f added dbt_runner for calling dbt rebuilds from n8n. Rewired n8n to call dbt.
fc7889b fixing some logic issues with refreshes.
cf00ca2 Project hygiene and docs
Merges
There were no merge commits in this window.
Deferred to the next recap
1,353 commits sit after this window's end as of 2026-08-30.
git rev-list --count --all --since='2026-02-01 23:59:59' # 1353
That raw tail includes every later week through the current partial week. In this backfill batch, every complete week from February 2 through March 29 is covered, and the existing recap series covers March 30 through August 23. No following complete week is genuinely uncovered; the week ending August 30 is in progress.